(NSI News Source Info) NEWTOWN, Pa., - August 23, 2010: The Lockheed Martin [NYSE: LMT] team developing the U.S. Air Force’s next generation Global Positioning System, known as GPS III, has successfully completed the program’s Critical Design Review (CDR) phase two months ahead of the baseline schedule. CDR completion, the program’s most significant milestone to-date, validates the detailed GPS III design to ensure it meets warfighter and civil requirements, and allows the program to begin the production phase.
More than 350 representatives from the U.S. Air Force Global Positioning Systems Wing, the GPS III contractor team, as well as user communities from the Department of Defense, Air Force Space Command, the Department of Transportation and the Federal Aviation Administration participated in a four-day Space Vehicle CDR at Lockheed Martin Space Systems Company’s new Patriot Center in Newtown, Pa.
Completion of the CDR phase represents the culmination of many rigorous assembly, subsystem, element, space vehicle and system level CDR events and validates the overall design maturity of the GPS III Space Vehicle and Lockheed Martin’s readiness to enter production.
http://defense-technologynews.blogspot.com/2010/08/dtn-news-us-air-forcelockheed-martin_23.html
Why Do I Feel Overwhelmed?
6 months ago
No comments:
Post a Comment